Quick Stone

When available GMG Stone offer QuickStone as an option to fast track the production of your Benchtops. There are obviously limitations to this service and acceptance would be on a job to job basis. Turnaround times starting from Overnight for a manufacture only job through to 4 days for more involved jobs which also require template and install.

Terms and conditions:

  • GMG Stone reserves the right to refuse QuickStone option, acceptance of Quickstone on a job to job basis
  • 30% Surcharge on top of original invoice amount
  • 1 day turnaround on Benchtops without laminations or Mitred edges (Manufacture Only)
  • 2 day turnaround on Benchtops with laminations or Mitred edges (Manufacture Only)
  • 3 day turnaround to Template, Manufacture and Install Benchtops without laminations or Mitred edges
  • 4 Day turnaround to Template, Manufacture and Install Benchtops with laminations or Mitred edges
  • Template and install job locations limited to 100klm radius surrounding Gold Coast and Toowoomba areas
  • Subject to Stone availability
  • Subject to current workload

Please advise Sales staff if you would like the Quickstone option added to your job

tat

Our Services